Auto & Parts
Tourism
Mcdicine & Chcemical
Agriculture & Green Food
Mine
Infrastructure
Others
 
Production of High-precision Beaten Aluminum Strip
  Proposed output: Heat heat-rolled coil strip 100000t/a, cold-rolled strip 800000t/a. Product identified is high-precision beaten aluminum strip (pot material excluded).Main products are: automotive laminated foil, trip for PS printing plate, decorative plate for building, aluminum foil blank and other strips. Total investment is 825.87 million Yuan, hereinto, fixed assets investment 784.77 million Yuan (foreign exchange 37 million US dollars included). Investment regained period is 8.27 years (construction period 3 years included). Profit margin of investment is 17.09%. Rate of profit & tax against investment is 23.49%.
../images/line_2.gif
Production of Spring Steel-pellet Jet Machine
  Yingli Ziyou dual-used intensive steel-pellet jet machine is the product that obtained national patent, Patent No. ZL99 2 5659.2. Comparing with ordinary steel-pellet jet machine, this one can increase work efficiency by 30%, save energy consumption by 40%, save steel pellet 1.5 kg / per ton, reduce production cost over 50 Yuan / per ton. The steel-pellet overlay rate is over 95%, the appearance quality of sprayed pellet improved obviously, spring fatigue limit increased by 20%, complete machine cost lowered by 25% and using life lengthened by 3 times. Total investment of the project is 2 million Yuan. Annual revenue is 27 million Yuan. Annual net profit is 1.81 million Yuan.
../images/line_2.gif
ZL Stimulant High-efficient Energy-saving Electromotor
  Alter the produce line of 50000 sets stimulant high-efficient energy-saving electromotor. Patent No. XO1239653.2. Main feature: comprehensively saving power by 20%, 3-row electromotor, 2 rows can also be started, one row can operate as usual. The electromotor can be started and normally operate under various voltage without being burned, it can bear excess work. Total investment is 22 million Yuan. Investment regained period is 1 year.
../images/line_2.gif
Joint Development of Patented Product---Pile-up Welding Rod
  Newly build repair welding rod produce line of 30-100 tons capacity. Patent No: CN1340397A. The rod is produced by cold pile-up welding, overlaying welding or repair welding to the mould, tool or work piece made of ferrous metal or its alloy. It is applicable for repairing moulds made in and out of China, soldering rejected parts or rework-needed parts. It is of great benefit in repairing significant and scarce key equipment, import equipment and components.
../images/line_2.gif
The Whole Huo River Power Plant on Sale
  Huo River 2-level Power Plant has equipment capacity of 9100 kilowatt, guaranteed exertion 2870 kilowatt; Huo River outfall 3-level Power Plant has equipment capacity of 3750 kilowatt, guaranteed exertion 1107 kilowatt. The plant is equipped with 10 sets of electricity-generating equipment and 5 sets of pressure-raising transformer with capacity 1660 kv as well as a 33.6 km long 35 kv power line. The reservoir capacity of the power plant is 102,000,000 cubic meters. It is a plant in the rear of the dam. The appraised value of the power plant assets is 85 million Yuan. The selling price is 70 million Yuan.
../images/line_2.gif
Transfer of Power Plant in Wangjiang River Valley
  There are 4 levels of power plant designed in the whole valley. Total capacity of all equipment to be installed is 15750 kw, actual fixable equipment is 16250 kw. So far 15500 kw equipment has been installed. Booked capital is 170 million Yuan, estimated gross capital is 180.03 million Yuan. Actual electricity-generating volume per annum is 50,000,000 KW/h, revenue is over 21 million Yuan. In principle, the price of external transferring is to be determined according to the appraised value.
../images/line_2.gif
Auction of Central-heating, Thermoelectricity Joint Generation Project in Shiyan City
  The construction of central-heating and thermoelectricity joint generation project of Shiyan city started at the end of 1996; it is listed in the category of national debt fund support in 1998; acquired additional national debt fund support in 1999; No.1 furnace, No.1 machine and 1st stage heat network were constructed in December 1999 and network supply of electricity was achieved, the price is 0.47 Yuan per KW/h, external supply of heating steam was achieved as well. No.2 and No. 3 furnaces were set up and put into use in June, 2000; No. 2 machine was put into use in May 2001; the electrostatic dust catcher of No.1 furnace started operating in July 2001. Therefore, the capacity with 3 furnaces and two machines came into being and the accumulative investment 215.5 million was fulfilled. Currently the project is operating normally.
../images/line_2.gif