Production of High-precision
Beaten Aluminum Strip |
| Proposed output: Heat heat-rolled coil strip
100000t/a, cold-rolled strip 800000t/a. Product
identified is high-precision beaten aluminum strip
(pot material excluded).Main products are: automotive
laminated foil, trip for PS printing plate, decorative
plate for building, aluminum foil blank and other
strips. Total investment is 825.87 million Yuan,
hereinto, fixed assets investment 784.77 million
Yuan (foreign exchange 37 million US dollars included).
Investment regained period is 8.27 years (construction
period 3 years included). Profit margin of investment
is 17.09%. Rate of profit & tax against investment
is 23.49%. |
 |
Production of Spring Steel-pellet
Jet Machine |
| Yingli Ziyou dual-used intensive steel-pellet
jet machine is the product that obtained national
patent, Patent No. ZL99 2 5659.2. Comparing with
ordinary steel-pellet jet machine, this one can
increase work efficiency by 30%, save energy consumption
by 40%, save steel pellet 1.5 kg / per ton, reduce
production cost over 50 Yuan / per ton. The steel-pellet
overlay rate is over 95%, the appearance quality
of sprayed pellet improved obviously, spring fatigue
limit increased by 20%, complete machine cost lowered
by 25% and using life lengthened by 3 times. Total
investment of the project is 2 million Yuan. Annual
revenue is 27 million Yuan. Annual net profit is
1.81 million Yuan. |
 |
ZL Stimulant High-efficient
Energy-saving Electromotor |
| Alter the produce line of 50000 sets stimulant
high-efficient energy-saving electromotor. Patent
No. XO1239653.2. Main feature: comprehensively saving
power by 20%, 3-row electromotor, 2 rows can also
be started, one row can operate as usual. The electromotor
can be started and normally operate under various
voltage without being burned, it can bear excess
work. Total investment is 22 million Yuan. Investment
regained period is 1 year. |
 |
Joint Development of Patented
Product---Pile-up Welding Rod |
| Newly build repair welding rod produce line
of 30-100 tons capacity. Patent No: CN1340397A.
The rod is produced by cold pile-up welding, overlaying
welding or repair welding to the mould, tool or
work piece made of ferrous metal or its alloy. It
is applicable for repairing moulds made in and out
of China, soldering rejected parts or rework-needed
parts. It is of great benefit in repairing significant
and scarce key equipment, import equipment and components. |
 |
The Whole Huo River Power
Plant on Sale |
| Huo River 2-level Power Plant has equipment
capacity of 9100 kilowatt, guaranteed exertion 2870
kilowatt; Huo River outfall 3-level Power Plant
has equipment capacity of 3750 kilowatt, guaranteed
exertion 1107 kilowatt. The plant is equipped with
10 sets of electricity-generating equipment and
5 sets of pressure-raising transformer with capacity
1660 kv as well as a 33.6 km long 35 kv power line.
The reservoir capacity of the power plant is 102,000,000
cubic meters. It is a plant in the rear of the dam.
The appraised value of the power plant assets is
85 million Yuan. The selling price is 70 million
Yuan. |
 |
Transfer of Power Plant
in Wangjiang River Valley |
| There are 4 levels of power plant designed in
the whole valley. Total capacity of all equipment
to be installed is 15750 kw, actual fixable equipment
is 16250 kw. So far 15500 kw equipment has been
installed. Booked capital is 170 million Yuan, estimated
gross capital is 180.03 million Yuan. Actual electricity-generating
volume per annum is 50,000,000 KW/h, revenue is
over 21 million Yuan. In principle, the price of
external transferring is to be determined according
to the appraised value. |
 |
Auction of Central-heating,
Thermoelectricity Joint Generation Project in Shiyan
City |
| The construction of central-heating and thermoelectricity
joint generation project of Shiyan city started
at the end of 1996; it is listed in the category
of national debt fund support in 1998; acquired
additional national debt fund support in 1999; No.1
furnace, No.1 machine and 1st stage heat network
were constructed in December 1999 and network supply
of electricity was achieved, the price is 0.47 Yuan
per KW/h, external supply of heating steam was achieved
as well. No.2 and No. 3 furnaces were set up and
put into use in June, 2000; No. 2 machine was put
into use in May 2001; the electrostatic dust catcher
of No.1 furnace started operating in July 2001.
Therefore, the capacity with 3 furnaces and two
machines came into being and the accumulative investment
215.5 million was fulfilled. Currently the project
is operating normally. |
 |
|
|
|
|
 |